Global Aashiyana

Nizarapar Road, Birubari, Guwahati Key Distance
  • Bhangaghar Flyover : 2.0 Km
  • GMDA : 1.9 Km
  • GMC Hospital 1.7 Km
  • Sarabhati Charali : 1.5 Km
  • Athgaon : 2.0 Km

Specifications

STRUCTURE

  • Earthquake resitant. RCC framed structure conforming to IS 1893:2016 and IS 13920:2016'

FLOORING

  • 600mm × 600mm double charged tiles in all bedrooms. drawing. hall & kitchen.

KITCHEN

  • Granite top cooking platform with stainless steel sink & ceramic tiles up to 2 feet above the platform.

DOOR

  • Quality wooden door frame with flush doors.

WINDOWS

  • UPVC windows

WATER

  • 24 hours water supply with central iron removal plant.

STAIRCASE & LOBBY

  • Flooring to be of matt finish, anti-skid tiles with S.S. railings.

TOILETS

  • A. Wall finished with ceramic tiles upto ceiling height & flooring to be of anti-skid tiles
  • B. Sanitation of Jaquar/Hindware of equivalent brand
  • C. CP fittings of Jaquar/Hindware of equivalent brand. Diverter to be provided in all bathrooms

ELECTRICAL

  • Concealed electric wiring with modular switches, board & MCB. Provision for TV point in all rooms, geyser point in master bed room & drawing.

INTERIOR WALL

  • AAC block with cement plastering on both sides finished with wall care putty on interior surface

EXTERIOR WALL

  • Excellent front elevation finished with water proof acrylic smooth exterior emulsion piant.

FIRE SAFETY

  • Equiped with fire fighting devices in each block as per norms

LIFTS

  • Stainless steel & passenger auto lift of Kone/Schindler or equivalent brand.

Plans